Ticker Scout
← tickerscout.ai

Sempra (SRE)

CIK 0001032208 · NYSE · Latest period: Q3 FY2026 (ended 2026-09-30, 10-Q accession 0001032208-26-000054) · Annual report: FY2025 10-K (filed 2026-02-26, accession 0001032208-26-000010) · Next expected filing: 10-K ~2027-02-25

PeriodQ3 FY2026

Published

MetricAmountvs. year ago
Earnings$877,000,000up 1,039.0%
Revenue$3,191,000,000up 1.3%
Diluted EPS$1.34up 1,016.7%
Equity earnings$668,000,000up 41.5%

Company details

NameSempra
TickerSRE
CIK0001032208
ExchangeNYSE
StateCalifornia
IncorporationCalifornia
SIC4932
OfficeEnergy & Transportation
IndustryGas & Other Services Combined
Latest period coveredQ3 FY2026, ended 2026-09-30, 10-Q, accession 0001032208-26-000054
Fiscal year end12/31 (MM/DD)
Next expected filing10-K around 2027-02-25 (predicted)

AI synthesis of five filings for Sempra

Sources: the Annual Report on Form 10-K for fiscal 2025 (year ended December 31, 2025; accession 0001032208-26-000010), the Form 10-Q for the quarter ended September 30, 2026 (accession 0001032208-26-000054), and Sempra's 2026 current reports on Form 8-K, cited by accession where used. All amounts are in US dollars. "Earnings" means earnings attributable to common shares, as Sempra reports it.

Business

From the FY2025 10-K (accession 0001032208-26-000010), updated where noted for 2026 transactions.

Sempra is a holding company whose earnings come overwhelmingly from regulated electric and natural gas utilities in California and Texas. In California it owns San Diego Gas & Electric (SDG&E) and Southern California Gas Company (SoCalGas), which earn a regulator-authorized return on the capital they invest in pipes, wires and storage. Commodity costs pass through to customers without markup. In Texas it owns 80.25% of Oncor, the state's largest electric transmission and distribution utility, and 50% of Sharyland Utilities. It accounts for both as equity-method investments. Its third business, Sempra Infrastructure, develops and operates LNG export terminals, natural gas pipelines and power assets in the U.S. and Mexico. Sempra sold control of that business to KKR-affiliated investors on November 12, 2026, and now holds it as a 25% equity-method interest (see Subsequent events). Sempra describes its mission as building "America's leading utility growth business," with investment concentrated in California and Texas.

In fiscal 2025, Sempra earned $1,796 million in total. Segment earnings were $1,428 million at Sempra California and $861 million at Sempra Texas Utilities, Sempra Infrastructure lost $160 million, and Parent and other lost $333 million.

The three reportable segments:

  • Sempra California: SDG&E. SDG&E provides electricity to a population of about 3.6 million and natural gas to about 3.3 million of them, across roughly 4,100 square miles of San Diego County and southern Orange County. Its system includes 2,018 miles of transmission lines, 24,210 miles of distribution lines and 158 substations. Most of its customers now buy their electric commodity from community choice aggregators or direct-access providers, so for them SDG&E mainly earns on delivery. It earns no return on commodity sales volumes. SDG&E also owns 20% of the San Onofre nuclear plant, which closed in 2013 and is being decommissioned.
  • Sempra California: SoCalGas. SoCalGas is a gas distribution, transmission and storage utility serving a population of about 21.3 million across about 24,000 square miles of Southern and central California. Its network has 52,765 miles of distribution pipeline, and its four storage fields hold 137 Bcf of working gas. Aliso Canyon accounts for 86 Bcf (63%) of that capacity, of which the CPUC currently authorizes 68.6 Bcf. A gas-cost incentive mechanism lets SoCalGas share savings or costs when it buys gas below or above market benchmarks.
  • How the California utilities earn. The CPUC sets base revenue requirements in multi-year General Rate Cases (GRCs). It sets the authorized return in a cost-of-capital proceeding every three years, with an automatic adjustment mechanism between proceedings. For 2026–2028 the CPUC kept a 52% equity layer and authorized returns on equity of 9.93% for SDG&E and 9.78% for SoCalGas. The FERC separately regulates SDG&E's electric transmission rates. Programs approved outside the GRC, including wildfire-mitigation and pipeline-safety spending, are recovered through later filings that can be reviewed for reasonableness and partly disallowed.
  • Sempra Texas Utilities. Oncor delivers electricity to more than 4.1 million homes and businesses over more than 145,000 circuit miles of line, in a territory of about 14 million people that includes Dallas–Fort Worth, Midland, Odessa and much of north-central, eastern and western Texas. Oncor neither generates nor sells electricity: its revenue is regulated transmission and distribution tariffs set by the Public Utility Commission of Texas (PUCT). "Ring-fencing" commitments mean Sempra does not control Oncor. Seven of the 13 directors on Oncor's board must be independent, and Oncor can withhold dividends. Sempra's earnings from Texas are therefore equity earnings. Sharyland Utilities owns about 64 miles of transmission lines in south Texas.
  • Sempra Infrastructure. This segment comprises the operating companies of Sempra Infrastructure Partners (SI Partners) plus a holding company and certain service companies, in three business lines:
    • LNG. SI Partners owns 50.2% of Cameron LNG Phase 1 in Louisiana: three trains with 13.9 Mtpa of nameplate capacity, fully contracted under 20-year tolling agreements with affiliates of TotalEnergies, Mitsubishi and Mitsui. It owns 83.4% of ECA LNG Phase 1 in Baja California, Mexico, which has 3.25 Mtpa of nameplate capacity and 2.5 Mtpa of initial offtake sold to TotalEnergies and Mitsui. At Port Arthur, Texas, SI Partners owns 28% of the two-train Phase 1 project, about 13 Mtpa nameplate, under construction alongside KKR Denali (42%) and ConocoPhillips (30%). Trains 1 and 2 are expected at or near the end of 2027 and in 2028. It also owns 50.1% of the Phase 2 project (Blackstone holds 49.9%), which reached a positive final investment decision in September 2025 and whose trains 3 and 4 are expected in 2030 and 2031.
    • Energy Networks. About 1,985 miles of natural gas transmission pipeline in Mexico, contracted under long-term, U.S. dollar-based agreements with counterparties such as the CFE, Centro Nacional de Control de Gas and PEMEX. The Ecogas distribution utility in Mexico was sold in August 2026.
    • Low Carbon Solutions. 1,044 MW of operating wind and solar generation, the 625 MW Termoeléctrica de Mexicali (TdM) gas-fired plant, and the approximately 320 MW Cimarrón Wind project, which began commercial operations in March 2026.

At the end of 2025, Sempra owned 70% of SI Partners, KKR Pinnacle 20% and ADIA 10%. After the November 2026 sale, the KKR Partners own 65%, Sempra 25% and ADIA 10%. The Guaymas-El Oro segment of the Sonora pipeline in Mexico remains a project Sempra owns and funds alone.

Risk factors

Condensed from Item 1A of the FY2025 10-K (accession 0001032208-26-000010). The Q3 2026 10-Q (accession 0001032208-26-000054) adds no new risk factors, and later facts from it are labelled as such.

The risks below can materially affect Sempra's earnings, cash flow or credit standing:

  • California wildfire liability. Under California's doctrine of inverse condemnation, a utility whose equipment is found to have caused a fire is liable for the damage even without negligence. Recovery of those costs in rates is not assured. SDG&E relies on the state Wildfire Fund and the $18.0 billion Continuation Account created in 2025, which reimburse participating utilities' claims above $1 billion. Both can be depleted by other utilities' claims. Edison's Eaton fire, a "covered wildfire," could materially reduce or exhaust the Wildfire Fund, which would force SDG&E to write down its Wildfire Fund asset ($260 million at year-end 2025 and $239 million at September 30, 2026). SDG&E's expected share of shareholder contributions to the Continuation Account is $387 million through 2045. Wildfire insurance is getting harder and more expensive to obtain, including the $1.0 billion of primary coverage the legislation requires. SoCalGas also faces litigation over the January 2025 Los Angeles fires; Sempra itself was dismissed from the Palisades case in July 2026.
  • Regulatory disallowances and cost recovery. Large categories of utility spending are recovered only after reasonableness reviews. The January 2026 decision on SDG&E's 2024 GRC Track 2 request approved $1,023 million of $1,472 million of 2019–2022 wildfire-mitigation costs. That decision produced a $651 million pre-tax ($464 million after-tax) charge in the fourth quarter of 2025. Lower allowed returns, an adverse trigger of the cost-of-capital adjustment mechanism, or FERC rulings can also cut earnings. In December 2024 the FERC found SDG&E ineligible for its 0.50% California ISO incentive adder, a ruling SDG&E is appealing, and ordered refunds back to June 2019.
  • Natural gas policy and stranded assets. California policy aims to reduce gas use through electrification and building codes. Lower volumes spread fixed system costs over fewer customers. If gas assets cannot be repurposed or fully recovered, SDG&E and SoCalGas could face impairments and decommissioning costs. A permanent closure of Aliso Canyon could cause a material impairment.
  • No control over Oncor. Ring-fencing commitments limit Sempra's say over Oncor's budgets, dividends and strategy. Oncor must suspend distributions if its senior secured rating falls below BBB at any of the three agencies or if its debt-to-equity ratio would exceed the level the PUCT approved. Oncor's independent directors or the directors designated by its minority owner can also make it retain cash.
  • Executing Oncor's build-out. Oncor's 2026–2030 base capital plan of about $47.5 billion relies heavily on ERCOT's 765-kV transmission expansion and on connecting large loads such as data centers. Projects can be delayed, denied or cancelled, and forecast demand may not materialize. Texas rates are set on a historical test year, so cost increases are recovered with a lag. Oncor depends on external financing, and S&P lowered its ratings in July 2025, citing wildfire risk.
  • Capital needs and credit ratings. The businesses are capital-intensive, and Sempra depends on debt markets, asset sales and equity issuance. At September 30, 2026, Sempra's issuer ratings were Baa2 with a negative outlook at Moody's, BBB+ with a negative outlook at S&P, and BBB+ with a stable outlook at Fitch. The agencies list catastrophic wildfires, adverse California regulatory outcomes, and cost overruns or delays at Port Arthur LNG among potential triggers for downgrades. Keeping current ratings could require issuing more equity, including through the $3.0 billion at-the-market program, or selling more stakes in subsidiaries, which would dilute shareholders.
  • Holding-company structure. Sempra's ability to pay dividends and service its debt depends on distributions from subsidiaries and equity-method investees it does not fully control. Its claims rank behind those of each entity's own creditors.
  • The SI Partners sale and what Sempra keeps. The 10-K warned that the sale cuts Sempra's share of that business's cash flows and hands control to the KKR Partners, who may not manage it as Sempra expects. The Q3 10-Q adds three points. Roughly $5.3 billion of the purchase price is deferred, in instruments issued by indirect equity holders of the KKR Partners that rank behind their subsidiaries' senior debt. Sempra expects to record credit-loss provisions on those notes. And Sempra keeps substantially the same funding obligations as before for cost overruns at ECA LNG Phase 1 and Port Arthur LNG Phase 1.
  • LNG construction and contracts. Projects can run late or over budget. ECA LNG Phase 1 has depended on Mexican and U.S. permit extensions, and its customers gained the right to terminate their contracts when commercial operations did not start by February 24, 2026. Port Arthur Phase 1 is on a greenfield site. The LNG business relies on long-term contracts with a small number of customers.
  • Mexico. Constitutional changes in 2024, the 2025 Energy Laws and their October 2025 regulations increase state control of the energy sector, favor state-owned companies and shorten some permit terms. Elected judges may make contracts with state entities harder to enforce. Sempra also cites expropriation risk, a long-running land dispute next to the ECA Regas Facility, and peso and Mexican-inflation swings that affect income taxes. Deconsolidating SI Partners is expected to reduce that last effect.
  • Tariffs and trade. U.S. tariffs on steel, aluminum, copper and imported equipment such as transformers raise construction and procurement costs. Retaliatory measures, including China's tariff on U.S. LNG, could weaken demand for LNG exports.
  • Cyber and technology. Attacks on utility systems are increasingly sophisticated, including by nation-state actors and with AI tools. Sempra relies more and more on cloud and third-party vendors, and its cyber insurance is limited.
  • Other structural exposures. Sempra could owe substantial taxes if Energy Future Holdings' 2016 spin-off of Vistra is ever deemed taxable as a result of Sempra's 2018 merger with EFH. SI Partners also carries credit and performance risk on its contracts with PEMEX and the CFE.

Management's discussion: fiscal 2025

From Item 7 of the FY2025 10-K (accession 0001032208-26-000010). Per-share and adjusted figures are from the fourth-quarter 2025 earnings release furnished with Form 8-K (accession 0001032208-26-000008).

Fiscal 2025 GAAP earnings fell to $1,796 million, or $2.75 per diluted share, from $2,817 million, or $4.42, in 2024. The decline reflects a regulatory disallowance at SDG&E, income tax charges triggered when Sempra classified SI Partners and Ecogas as held for sale in 2025, and adverse Mexican currency and inflation effects. Sempra's non-GAAP adjusted earnings, which exclude those items and Mexican currency effects, were $3,066 million ($4.69 per share) against $2,969 million ($4.65) in 2024. Revenues were $13,702 million, up from $13,185 million. Sempra invested $12.6 billion in capital expenditures and investments.

Results by segment:

  • Sempra California: earnings down $418 million (23%) to $1,428 million. The largest item was a $432 million after-tax charge for 2019–2024 costs disallowed under the Track 2 decision. Other drags were $159 million lower income tax benefits, $63 million higher net interest expense and a $25 million write-off of disallowed COVID-19 costs. These were partly offset by $148 million higher CPUC base operating margin and by the absence of an $89 million FERC transmission refund charge recorded in 2024.
  • Sempra Texas Utilities: earnings up $80 million (10%) to $861 million. Higher Oncor revenues came from the new Unified Tracker Mechanism (UTM), rate updates for invested capital, customer growth and a larger energy-efficiency bonus. They were partly offset by higher interest, depreciation and operating costs. Texas legislation in June 2025 created the UTM, which lets Oncor seek one interim rate update a year through 2035 for transmission and distribution investment.
  • Sempra Infrastructure: a $160 million loss versus $911 million of earnings in 2024. The swing came mainly from $703 million of income tax expense on classifying SI Partners and Ecogas as held for sale. A $445 million adverse swing in foreign currency and inflation effects on Mexican monetary positions also contributed. Higher asset and supply optimization income (+$52 million), lower credit-loss provisions and the halt of depreciation on held-for-sale assets partly offset these.
  • Parent and other: losses narrowed by $388 million to $333 million. The main reasons were smaller tax valuation-allowance charges than in 2024 and a $191 million net tax benefit tied to the held-for-sale classification, partly offset by $92 million higher net interest expense.

Consolidated interest expense rose $483 million (46%) to $1.5 billion, mainly from unrealized swings on Port Arthur LNG Phase 1 interest rate swaps and higher debt balances. Equity earnings held at about $1.6 billion.

In 2025 Sempra signed the two capital-recycling deals that shape 2026. In September it agreed to sell 45% of SI Partners to the KKR Partners for $9.99 billion, subject to adjustments. In December it agreed to sell Ecogas for 9.0 billion Mexican pesos. It also redeemed its $900 million of series C preferred stock in October 2025. California passed 2025 wildfire legislation creating the Continuation Account. Oncor filed a comprehensive rate review, which it settled in January 2026.

The 10-K projected capital expenditures and investments of about $8.6 billion in 2026 and $38.7 billion for 2026–2030. On a different basis, which includes Sempra's proportionate share of capital spending at equity-method investees such as Oncor and excludes the shares of noncontrolling partners, the projection was $64.9 billion of capital expenditures for 2026–2030. The fourth-quarter earnings release presented this as a record capital plan of about $65 billion, more than 95% of it for regulated utilities.

Current period: third quarter and first nine months of 2026

From the Q3 2026 10-Q (accession 0001032208-26-000054) and the third-quarter earnings release furnished with Form 8-K (accession 0001032208-26-000051).

Third-quarter GAAP earnings were $877 million, or $1.34 per diluted share, compared with $77 million ($0.12) a year earlier. The prior-year quarter carried a $514 million tax charge from the held-for-sale classification. For the nine months, earnings were $2,710 million ($4.13) versus $1,444 million ($2.21). Adjusted earnings, a non-GAAP measure, were $917 million ($1.40) in the quarter versus $728 million ($1.11), and $2,670 million ($4.07) for the nine months versus $2,253 million ($3.45). Quarterly revenues were $3,191 million against $3,151 million; nine-month revenues were $9,843 million against $9,953 million.

Earnings by segment:

Earnings ($ millions)Q3 2026Q3 20259M 20269M 2025
Sempra California2233701,2401,353
Sempra Texas Utilities460306977660
Sempra Infrastructure346(580)838(362)
Parent and other(152)(19)(345)(207)
Total877772,7101,444

What drove the quarter:

  • California fell 40%, almost entirely because of a regulatory charge. Q3 included a net $205 million pre-tax ($151 million after-tax) charge for regulatory disallowances, of which $202 million ($149 million after tax) related to prior years. The CPUC's proposed decisions on the 2024 GRC Track 3 requests led SoCalGas to record a $217 million charge for pipeline-safety costs. SDG&E recorded a $104 million credit, partly reversing its 2025 Track 2 charge, after a proposed decision approved a settlement reducing its requested wildfire-mitigation revenue requirement from $766 million to $621 million. A proposed decision on SoCalGas's transmission integrity program led to a further $92 million charge. Partly offsetting it, CPUC base operating margin rose $38 million.
  • Texas rose 50% on Oncor's new rates. The PUCT's April 2026 order in Oncor's rate review raised its annual revenue requirement by about $560 million and set a 43.5% equity ratio (up from 42.5%) and a 9.75% return on equity (from 9.70%). New rates took effect June 1, 2026, and a surcharge recovering the January–May difference began August 1. Second-quarter results included about $50 million after tax attributable to the first quarter. The UTM mechanism and higher weather-driven consumption also contributed. Oncor set a system peak of 33.3 GW, and in April it filed its first UTM application, covering about $4.4 billion of 2025 investment.
  • Infrastructure swung to a profit. The main reasons were the absence of last year's $705 million deferred tax charge and a $98 million favorable swing in Mexican currency and inflation effects. A $97 million after-tax, after-noncontrolling-interest gain on the August 2026 Ecogas sale also helped ($198 million pre-tax; proceeds of 9.0 billion pesos, or $524 million net). So did $32 million lower depreciation on held-for-sale assets and the absence of 2025 contract-termination costs. Asset and supply optimization income fell $50 million on unrealized derivative losses.
  • Parent and other. Losses widened by $133 million, mainly because Q3 2025 had included $191 million of net tax benefits that did not recur.

Operating developments in the nine months:

  • ECA LNG Phase 1 exported its first cargo on July 7, 2026, during commissioning. A planned inspection afterward found damage to its refrigerant and boil-off gas compressors. Sempra now expects substantial completion in the fourth quarter of 2026, with long-term sales starting shortly after. The customers' contractual termination right remains open, though none had given notice as of November 5, 2026.
  • Port Arthur LNG Phase 2. In September 2026 SI Partners signed a 20-year agreement to supply Petrobras with 0.8 Mtpa. Total Phase 2 capital spending is still estimated at about $14 billion, including a $1.9 billion payment to Phase 1 for a 50% share of common facilities. The Port Arthur Pipeline Louisiana Connector went into service in June 2026. In April, Port Arthur LNG I issued $2.0 billion of 6.43% senior secured notes due 2048 to repay part of its term loan.
  • SDG&E. The FERC approved SDG&E's TO6 transmission settlement in June 2026, and SDG&E recognized its retroactive impact in the second quarter. In July, after CPUC approval, SDG&E bought Westside Canal 2A, LLC, owner of a 119 MW battery storage facility in Imperial County, California, from a subsidiary of RWE AG. The total price is $205 million: $195 million paid in cash and $10 million due on post-closing milestones. SDG&E's union contracts were extended to August 2029. In September the California Supreme Court declined review of the City of San Diego franchise challenge, which ended that case in SDG&E's favor.
  • Texas transmission build-out. In August 2026 the PUCT approved a Permian Basin 765-kV line Oncor will build, subject to rehearing and appeal; a separate joint-line application received a recommendation for denial. ERCOT's batch interconnection process for large loads, now subject to a data-center audit ordered by the Governor of Texas, conditionally classified about 24 GW of large load in Oncor's area as base load and 21 GW as studied load.

Financing and liquidity. Besides note and first mortgage bond offerings at Sempra, SDG&E and SoCalGas that mainly refinanced maturities and commercial paper, Sempra borrowed $1.0 billion under a new 364-day term loan facility in July and September 2026. At September 30, 2026, Sempra's committed credit lines totaled $10.0 billion, with about $8.0 billion unused.

Outlook. The November 5 release made these changes:

  • 2026 GAAP EPS guidance was updated to $7.41–$8.41, from $5.02–$5.55 in August.
  • Sempra expects 2026 adjusted EPS at the high end of its $4.80–$5.30 range.
  • 2027 EPS guidance of $5.10–$5.70 was affirmed, but results could fall in the lower half. On October 29 the CPUC proposed denying the utilities' request to correct the 2024 GRC post-test-year capital mechanism. If that stands, Sempra California expects its 2027 earnings at the low end of its segment range unless mitigated.
  • The 7%–9% long-term EPS growth rate was affirmed.

Capital expenditures for 2026 are now expected at about $12.1 billion, up from $8.6 billion, because the later SI Partners closing kept Sempra consolidating that business's spending longer. Oncor expects its 2027–2031 base capital plan to be about 20% above its $47.5 billion 2026–2030 plan.

Subsequent events

Events after September 30, 2026, from the Q3 10-Q (accession 0001032208-26-000054; filed November 5, 2026) and Form 8-K filed November 12, 2026 (accession 0001032208-26-000057).

  • SI Partners stake sale closed (November 12, 2026). Sempra completed the sale of a 45% equity interest in Sempra Infrastructure Partners, LP to entities owned by affiliates of Kohlberg Kravis Roberts & Co. L.P. and co-investor Canada Pension Plan Investment Board. The base price agreed in September 2025 was $9.99 billion. Sempra received $4.56 billion in cash at closing, subject to post-closing adjustments. The remainder is deferred in two pieces:
    • $4.14 billion plus 7.5% interest compounded quarterly, maturing December 31, 2027 ($4.51 billion in total). These instruments are supported by equity commitment letters from investors in the KKR Partners.
    • $1.20 billion of promissory notes bearing 8.5% interest compounded quarterly until January 1, 2031 and 10.0% thereafter, maturing February 11, 2034 ($2.31 billion if held to maturity).

Sempra expects a pre-tax gain of about $2.80–$3.30 billion ($2.00–$2.40 billion after tax). It also expects about $450–$550 million ($325–$400 million after tax) of transaction-related costs, including credit-loss provisions on the notes and a reimbursement to ADIA. Ownership is now KKR Partners 65%, Sempra 25%, ADIA 10%. Sempra deconsolidated SI Partners effective November 12, 2026 and now accounts for its 25% under the equity method within the Sempra Infrastructure segment. Under the new partnership agreement Sempra appoints two of seven managers. It cannot transfer its interest before January 1, 2029.

  • Norte fire (October 16, 2026). A fire near San Clemente, California, damaged or destroyed seven homes, according to the Orange County Fire Authority. SDG&E had an outage involving its electrical facilities in the area the same day. The causes of the fire and of the outage are both unknown and under investigation. On October 19 a lawsuit was filed against SDG&E, Enova Corporation and Sempra alleging that SDG&E's facilities caused the fire. It claims negligence and inverse condemnation and seeks punitive damages. Sempra says it cannot estimate the outcome.
  • Wildfire Fund drawdowns (October 2026). PG&E disclosed about $1.38 billion of Wildfire Fund reimbursements. Edison disclosed about $859 million for the Eaton fire, which investigators found was caused by Edison's equipment. SDG&E cannot estimate the potential loss from reduced fund coverage, and a material depletion could require a write-down of its $239 million Wildfire Fund asset.
  • CPUC decisions (October 2026).
    • On October 29 the CPUC approved a revised proposed decision on SoCalGas's transmission integrity costs that cuts the disallowance by about $30 million. The third-quarter charge may therefore change once SoCalGas's advice letter is approved.
    • Separately, a proposed decision would deny the 2024 GRC petition for modification. The petition sought, for SDG&E, $55 million, $87 million and $79 million and, for SoCalGas, $86 million, $122 million and $109 million of added revenue requirement for 2025–2027. A final decision is expected in the fourth quarter.
  • Port Arthur LNG Phase 2 contract change (October 2026). A change order adding a nitrogen rejection unit raised the Bechtel engineering, procurement and construction price to about $10 billion, from $9.2 billion. Total project capital spending is still estimated at about $14 billion.
  • Term loan extension (October 13, 2026). Sempra extended the maturity of its $1.75 billion 364-day term loan to December 24, 2026.
  • Port Arthur construction-incident litigation. In August 2026 the claims from the April 2025 incident that killed three Bechtel workers were settled in principle. As of November 2, 2026, the claims of 10 of 26 plaintiffs had been fully resolved and dismissed. Bechtel is indemnifying under its construction contract.

AI synthesis of events in 20 filings

Filings that contain financial statements

Sempra's earnings-release 8-Ks carry condensed financial statements in Exhibit 99.1 (income statement, balance sheets and cash flow statement, plus GAAP-to-adjusted earnings reconciliations):

  • Form 8-K filed 2026-11-05, accession 0001032208-26-000051: three and nine months ended September 30, 2026 (statements of operations, balance sheets, statements of cash flows).
  • Form 8-K filed 2026-08-06, accession 0001032208-26-000043: three and six months ended June 30, 2026 (statements of operations, balance sheets, statements of cash flows).
  • Form 8-K filed 2026-05-07, accession 0001032208-26-000027: three months ended March 31, 2026 (statements of operations, balance sheets, statements of cash flows).
  • Form 8-K filed 2026-02-26, accession 0001032208-26-000008: three months and year ended December 31, 2025 (statements of operations, balance sheets, statements of cash flows). Exhibit 99.2 adds statements of operations data by segment for the same periods.

Sempra Infrastructure Partners sale to KKR: closed

  • 2026-11-12 (Form 8-K, 0001032208-26-000057). Sempra completed the sale of a 45% equity interest in Sempra Infrastructure Partners, LP to entities owned by affiliates of Kohlberg Kravis Roberts & Co. L.P. and indirect co-investor Canada Pension Plan Investment Board. Sempra received $4.56 billion in cash at closing, subject to post-closing adjustments. The remainder is owed under promissory notes and other instruments: $4.14 billion plus interest compounded quarterly at 7.5% (totaling $4.51 billion with interest) maturing December 31, 2027, supported by equity commitment letters from investors in the buyer group; and $1.20 billion plus interest compounded quarterly at 8.5% before January 1, 2031 and 10.0% thereafter, maturing February 11, 2034 (totaling $2.31 billion if held to maturity).
  • Sempra expects a gain of about $2.80 billion to $3.30 billion ($2.00 billion to $2.40 billion after tax) and roughly $450 million to $550 million ($325 million to $400 million after tax) of additional transaction costs, all preliminary and subject to post-closing adjustments.
  • After the sale, the buyer group owns 65% of Sempra Infrastructure Partners, Sempra retains 25% and ADIA retains 10%. Sempra deconsolidated the business effective November 12, 2026 and now accounts for its 25% interest under the equity method within the Sempra Infrastructure segment.
  • The Q3 earnings release (2026-11-05) had said the closing was expected within two weeks; the Q1 release (2026-05-07) had said regulatory approvals from FERC, Hart-Scott-Rodino and antitrust authorities in Mexico and Korea were already received.
  • Ecogas México: the Q3 release (0001032208-26-000051) reports that Sempra Infrastructure Partners completed the sale of Ecogas México in August 2026, with a $97 million after-tax gain excluded from adjusted earnings.

Management changes

  • 2026-07-09 (Form 8-K, 0001032208-26-000040). The Board appointed Justin C. Bird, previously Executive Vice President and CEO of Sempra Infrastructure, as Executive Vice President and Chief Financial Officer, effective around the closing of the Sempra Infrastructure Partners sale. Karen L. Sedgwick, the current CFO, becomes CEO and President of Southern California Gas Company on the same date.
  • 2026-11-12 (Form 8-K, 0001032208-26-000057). Following the closing, Mr. Bird's appointment is effective November 13, 2026, with Ms. Sedgwick's SoCalGas role effective the same day.

Earnings and guidance

  • 2026-11-05, Q3 2026 (0001032208-26-000051). GAAP earnings of $877 million ($1.34 per diluted share) versus $77 million ($0.12) a year earlier; adjusted earnings $917 million ($1.40) versus $728 million ($1.11). Nine-month GAAP earnings $2.710 billion ($4.13) and adjusted $2.670 billion ($4.07). The 2026 GAAP EPS guidance range was updated to $7.41 to $8.41 and Sempra is guiding to the high end of its $4.80 to $5.30 adjusted range; 2027 guidance of $5.10 to $5.70 and the 7% to 9% long-term EPS growth rate were affirmed. Oncor expects its 2027-2031 base capital plan to be about 20% above its 2026-2030 plan; Sempra expects to announce its 2027-2031 plan in February 2027. Third-quarter adjustments included a $149 million after-tax impact from regulatory disallowances.
  • Regulatory risk flagged in the same release: on October 29 the CPUC issued a proposed decision denying SoCalGas and SDG&E's request to correct the 2024 General Rate Case capital attrition mechanism for 2027. If not successful in other avenues, Sempra California expects 2027 earnings at the low end of its segment guidance range, and Sempra says pending outcomes could put it in the lower half of its 2027 EPS guidance range unless mitigated.
  • 2026-08-06, Q2 2026 (0001032208-26-000043). GAAP earnings $796 million ($1.21) versus $461 million ($0.71); adjusted $762 million ($1.16) versus $583 million ($0.89). 2026 GAAP guidance updated to $5.02 to $5.55; adjusted ($4.80 to $5.30), 2027 ($5.10 to $5.70) and long-term growth (7% to 9%) affirmed. Oncor's new base rates took effect June 1, with a surcharge effective August 1.
  • 2026-05-07, Q1 2026 (0001032208-26-000027). GAAP earnings $1.04 billion ($1.58) versus $906 million ($1.39); adjusted $991 million ($1.51) versus $942 million ($1.44). 2026 GAAP guidance updated to $4.87 to $5.37; other guidance affirmed.
  • 2026-02-26, Q4 and full-year 2025 (0001032208-26-000008). Full-year 2025 GAAP earnings $1.80 billion ($2.75) versus $2.82 billion ($4.42); adjusted $3.07 billion ($4.69) versus $2.97 billion ($4.65). Fourth-quarter GAAP earnings $352 million ($0.54), adjusted $841 million ($1.28). Sempra raised its five-year 2026-2030 capital plan to about $65 billion from $56 billion (over 95% in regulated Texas and California utilities), identified a further $9 billion of potential incremental capital, affirmed 2026 adjusted EPS guidance of $4.80 to $5.30, introduced 2027 guidance of $5.10 to $5.70 and a 2030 outlook of $6.70 to $7.50. The quarterly dividend was set at $0.6575 per share ($2.63 annualized, up from $2.58).

Regulatory developments

  • Oncor rate case. 2026-01-29 (0001032208-26-000004): Oncor (Sempra owns 80.25%) filed an unopposed settlement requesting an annual revenue requirement of about $6.975 billion, authorized ROE of 9.75% (from 9.70%), 56.5% debt / 43.5% equity capital structure and cost of debt of 4.94%. 2026-04-17 (0001032208-26-000020): the Public Utility Commission of Texas approved a final order on those terms, with an annual revenue requirement of about $6.97 billion, an increase of about $560 million (8.7%), plus a $200 million annual self-insurance reserve accrual (from $122 million). Rates can be surcharged back to January 1, 2026.
  • SDG&E FERC transmission (TO6). 2026-03-26 (0001032208-26-000016): SDG&E filed an unopposed settlement raising its authorized base ROE from 10.10% to 10.28% with a 54% equity hypothetical capital structure, retroactive to June 1, 2025 if approved; Sempra said the effect falls within existing 2026 and 2027 EPS guidance. The Q2 release (2026-08-06) reports FERC approval.
  • 2028 General Rate Case filings. 2026-06-16 (0001032208-26-000037): SDG&E and SoCalGas filed 2028 GRC applications on June 15, requesting 2028 test-year revenue requirements of $3,760 million (SDG&E) and $5,096 million (SoCalGas), with attrition-year increases through 2031. Requested effective date is January 2028; the CPUC's decision may differ materially.

Wildfire litigation

  • 2026-01-21 (Form 8-K, Item 7.01, 0001032208-26-000002). SoCalGas issued a statement that on January 16, 2026 Southern California Edison filed cross-claims in the Eaton Fire litigation against more than a dozen defendants including SoCalGas. SoCalGas said it will vigorously defend, intends to seek recovery from Edison for damage to its system, and has insurance including wildfire insurance, which it will pursue for the damages and defense, including for pending Palisades fire lawsuits.

Debt issuance

  • Sempra: $800 million 5.250% Notes due 2036 closed 2026-03-13 (0001193125-26-106115); $1.0 billion Floating Rate Notes due 2028 (Compounded SOFR plus 0.670%) closed 2026-06-09 (0001193125-26-263777).
  • SDG&E: $625 million 5.200% First Mortgage Bonds due 2036 and $475 million 5.950% First Mortgage Bonds due 2056; underwriting agreement 2026-03-16 (0001193125-26-110848), closed 2026-03-20 (0001193125-26-117625).
  • SoCalGas: $650 million 5.900% First Mortgage Bonds due 2056; underwriting 2026-05-11 (0001193125-26-219514), closed 2026-05-15 (0001193125-26-226918). $500 million 5.500% First Mortgage Bonds due 2036; underwriting 2026-08-17 (0001193125-26-355501), closed 2026-08-21 (0001193125-26-361126).

Governance

  • 2026-05-14 (Form 8-K, Item 5.07, 0001032208-26-000032). At the May 12, 2026 annual meeting, shareholders elected all eleven director nominees, ratified Deloitte & Touche LLP as auditor for 2026, approved executive compensation on an advisory basis, and did not approve a shareholder proposal for an independent board chairman.

Financials

Figures link to the filing they came from. Wherever the SEC filing tags a number, that number is linked: click it and the filing opens at the exact line that prints it. A figure with no link was either derived by AI, such as a margin, free cash flow or a trailing-twelve-month total, or taken from a filing that does not tag its numbers, such as an earnings release.

About this file

TickerSRE
CIK0001032208
CompanySempra
Business typeutility
Schema templateregulated utility holding company: revenues by the filing's own categories (utility natural gas, utility electric, energy-related businesses), operating costs by nature, equity earnings, net income and earnings attributable to common shares, diluted EPS; balance sheet with debt, held-for-sale assets and liabilities, contingently redeemable noncontrolling interest and equity; operating cash flow against capital expenditures
Reporting currencyUSD
Converted to USDno
Unitsactual US dollars (not millions); share counts in actual shares; per-share amounts in US dollars

SRE annual income statement, balance sheet and cash flow

Taken from the SEC filings and normalized to actual dollars.

FY2025FY2024FY2023
Period start2025-01-012024-01-012023-01-01
Period end2025-12-312024-12-312023-12-31
Period typefiscal yearfiscal yearfiscal year
Source accession10-K10-K10-K
Income statement
Utility natural gas revenues7,319,000,0007,141,000,0009,495,000,000
Utility electric revenues4,552,000,0004,296,000,0004,334,000,000
Energy related businesses revenues1,831,000,0001,748,000,0002,891,000,000
Total revenues13,702,000,00013,185,000,00016,720,000,000
Cost of natural gas-1,282,000,000-1,132,000,000-3,719,000,000
Cost of electric fuel and purchased power-385,000,000-245,000,000-375,000,000
Energy related businesses cost of sales-367,000,000-380,000,000-548,000,000
Operation and maintenance-5,281,000,000-5,336,000,000-5,458,000,000
Regulatory disallowances-651,000,00000
Depreciation and amortization-2,563,000,000-2,437,000,000-2,227,000,000
Franchise fees and other taxes-744,000,000-693,000,000-677,000,000
Other income net169,000,000136,000,000131,000,000
Interest income103,000,00061,000,00089,000,000
Interest expense-1,532,000,000-1,049,000,000-1,309,000,000
Income before income taxes and equity earnings1,169,000,0002,110,000,0002,627,000,000
Income tax expense-701,000,000-219,000,000-490,000,000
Equity earnings1,604,000,0001,609,000,0001,481,000,000
Net income2,072,000,0003,500,000,0003,618,000,000
Earnings attributable to noncontrolling interests-238,000,000-638,000,000-543,000,000
Earnings attributable to contingently redeemable noncontrolling interest3,000,00000
Preferred deemed dividends-11,000,00000
Preferred dividends-29,000,000-44,000,000-44,000,000
Preferred dividends of subsidiary-1,000,000-1,000,000-1,000,000
Net income attributable to common shareholders1,796,000,0002,817,000,0003,030,000,000
Basic EPS2.754.444.81
Basic shares652,697,000633,795,000630,296,000
Diluted EPS2.754.424.79
Diluted shares653,826,000637,943,000632,733,000
Dividends declared per common share2.582.482.38
Balance sheet
Cash and cash equivalents29,000,0001,565,000,000
Restricted cash current2,000,00021,000,000
Assets held for sale31,024,000,0000
Total current assets34,837,000,0005,285,000,000
Investment in oncor holdings17,472,000,00015,400,000,000
Property plant and equipment net49,011,000,00061,437,000,000
Total assets110,878,000,00096,155,000,000
Short term debt4,166,000,0002,016,000,000
Current portion of long term debt and finance leases1,876,000,0002,274,000,000
Liabilities held for sale11,704,000,0000
Total current liabilities21,894,000,0009,676,000,000
Long term debt and finance leases28,979,000,00031,558,000,000
Total deferred credits and other liabilities18,006,000,00017,133,000,000
Redeemable noncontrolling interest3,206,000,0000
Preferred stock0889,000,000
Common stock14,699,000,00013,520,000,000
Retained earnings17,092,000,00016,979,000,000
Total sempra shareholders equity31,594,000,00031,222,000,000
Preferred stock of subsidiary20,000,00020,000,000
Other noncontrolling interests7,179,000,0006,546,000,000
Total equity38,793,000,00037,788,000,000
Common shares outstanding652,731,668650,629,876
Total debt35,021,000,00035,848,000,000
Total liabilities68,879,000,00058,367,000,000
Cash flow
Depreciation and amortization2,563,000,0002,437,000,0002,227,000,000
Operating cash flow4,565,000,0004,907,000,0006,218,000,000
Capital expenditures-10,612,000,000-8,215,000,000-8,397,000,000
Expenditures for investments-2,015,000,000-988,000,000-382,000,000
Net cash used in investing activities-12,537,000,000-9,118,000,000-8,716,000,000
Common dividends paid-1,603,000,000-1,499,000,000-1,483,000,000
Repurchases of common stock-58,000,000-43,000,000-32,000,000
Issuances of debt11,282,000,0008,674,000,0007,669,000,000
Payments on debt and finance leases-5,220,000,000-3,339,000,000-6,294,000,000
Net cash provided by financing activities9,930,000,0005,424,000,0002,419,000,000
Free cash flow-6,047,000,000-3,308,000,000-2,179,000,000

SRE quarterly income statement, balance sheet and cash flow

Taken from the SEC filings and normalized to actual dollars.

Q3 2026Q3 2025
Period start2026-07-012025-07-01
Period end2026-09-302025-09-30
Period typethree monthsthree months
Source accession10-Q10-Q
Fiscal quarter33
Income statement
Utility natural gas revenues1,347,000,0001,363,000,000
Utility electric revenues1,391,000,0001,260,000,000
Energy related businesses revenues453,000,000528,000,000
Total revenues3,191,000,0003,151,000,000
Cost of natural gas-179,000,000-210,000,000
Cost of electric fuel and purchased power-154,000,000-122,000,000
Energy related businesses cost of sales-137,000,000-117,000,000
Operation and maintenance-1,219,000,000-1,349,000,000
Regulatory disallowances-205,000,0000
Depreciation and amortization-632,000,000-662,000,000
Franchise fees and other taxes-214,000,000-194,000,000
Gain on sales214,000,0000
Other income net58,000,00049,000,000
Interest income35,000,00017,000,000
Interest expense-298,000,000-403,000,000
Income before income taxes and equity earnings460,000,000160,000,000
Income tax expense-14,000,000-482,000,000
Equity earnings668,000,000472,000,000
Net income1,114,000,000150,000,000
Earnings attributable to noncontrolling interests-231,000,000-55,000,000
Earnings attributable to contingently redeemable noncontrolling interest00
Preferred deemed dividends0-11,000,000
Preferred deemed dividends of subsidiary-6,000,0000
Preferred dividends0-7,000,000
Preferred dividends of subsidiary00
Net income attributable to common shareholders877,000,00077,000,000
Basic EPS1.340.12
Basic shares654,262,000652,948,000
Diluted EPS1.340.12
Diluted shares655,939,000654,009,000
Dividends declared per common share0.650.65
Balance sheet
Cash and cash equivalents34,000,000
Restricted cash current2,000,000
Assets held for sale33,552,000,000
Total current assets37,318,000,000
Investment in oncor holdings20,010,000,000
Property plant and equipment net50,484,000,000
Total assets118,024,000,000
Short term debt4,438,000,000
Current portion of long term debt and finance leases1,528,000,000
Liabilities held for sale13,118,000,000
Total current liabilities23,209,000,000
Long term debt and finance leases31,508,000,000
Total deferred credits and other liabilities19,131,000,000
Redeemable noncontrolling interest3,392,000,000
Preferred stock0
Common stock14,760,000,000
Retained earnings18,513,000,000
Total sempra shareholders equity33,327,000,000
Preferred stock of subsidiary0
Other noncontrolling interests7,457,000,000
Total equity40,784,000,000
Common shares outstanding653,949,225
Total debt37,474,000,000
Total liabilities73,848,000,000
Cash flow
Operating cash flow1,563,000,0001,110,000,000
Capital expenditures-2,640,000,000-2,561,000,000
Expenditures for investments-610,000,000-520,000,000
Free cash flow-1,077,000,000-1,451,000,000
Cash flow source accessions10-Q, 0001032208-26-000043, 0001032208-26-00005110-Q, 0001032208-26-000043, 0001032208-26-000051
  • Cash flow derivation. Three-month cash flows are not printed in the Q3 2026 10-Q, whose cash flow statement covers nine months only. Operating cash flow, capital expenditures and expenditures for investments for this quarter are the nine-month figures in the Q3 2026 10-Q (accession 0001032208-26-000054) less the six-month figures in the second-quarter 2026 earnings release (Form 8-K, accession 0001032208-26-000043, Table C). The capital expenditure figures agree with the three-month amounts the third-quarter 2026 earnings release prints in Table D (Form 8-K, accession 0001032208-26-000051).

SRE year-to-date income statement and cash flow

Taken from the SEC filings and normalized to actual dollars.

Nine months ended September 30, 2026Nine months ended September 30, 2025
Period start2026-01-012025-01-01
Period end2026-09-302025-09-30
Period typenine monthsnine months
Source accession10-Q10-Q
Income statement
Utility natural gas revenues4,736,000,0005,195,000,000
Utility electric revenues3,773,000,0003,350,000,000
Energy related businesses revenues1,334,000,0001,408,000,000
Total revenues9,843,000,0009,953,000,000
Cost of natural gas-577,000,000-886,000,000
Cost of electric fuel and purchased power-349,000,000-265,000,000
Energy related businesses cost of sales-144,000,000-321,000,000
Operation and maintenance-3,712,000,000-3,931,000,000
Regulatory disallowances-205,000,0000
Depreciation and amortization-1,865,000,000-1,955,000,000
Franchise fees and other taxes-618,000,000-555,000,000
Gain on sales214,000,0000
Other income net225,000,000199,000,000
Interest income113,000,00065,000,000
Interest expense-1,110,000,000-1,195,000,000
Income before income taxes and equity earnings1,815,000,0001,109,000,000
Income tax expense-191,000,000-711,000,000
Equity earnings1,582,000,0001,190,000,000
Net income3,206,000,0001,588,000,000
Earnings attributable to noncontrolling interests-479,000,000-103,000,000
Earnings attributable to contingently redeemable noncontrolling interest-10,000,0000
Preferred deemed dividends0-11,000,000
Preferred deemed dividends of subsidiary-6,000,0000
Preferred dividends0-29,000,000
Preferred dividends of subsidiary-1,000,000-1,000,000
Net income attributable to common shareholders2,710,000,0001,444,000,000
Basic EPS4.142.21
Basic shares653,966,000652,538,000
Diluted EPS4.132.21
Diluted shares655,793,000653,420,000
Dividends declared per common share1.971.94
Cash flow
Depreciation and amortization1,865,000,0001,955,000,000
Operating cash flow4,680,000,0003,376,000,000
Capital expenditures-7,327,000,000-7,201,000,000
Expenditures for investments-2,095,000,000-1,492,000,000
Proceeds from sales net of transaction costs and cash sold535,000,0000
Net cash used in investing activities-8,906,000,000-8,605,000,000
Common dividends paid-1,245,000,000-1,195,000,000
Repurchases of common stock-21,000,000-58,000,000
Issuances of debt11,178,000,0008,892,000,000
Payments on debt and finance leases-6,891,000,000-4,142,000,000
Net cash provided by financing activities2,776,000,0006,661,000,000
Free cash flow-2,647,000,000-3,825,000,000

SRE trailing twelve month income statement and cash flow

Derived by AI from the figures the filings report. No filing prints these, so none of them is linked.

Trailing twelve months ended September 30, 2026
Period start2025-10-01
Period end2026-09-30
Period typetwelve months
Source accession10-Q
Derived from accessions10-K, 10-Q
Income statement
Utility natural gas revenues6,860,000,000
Utility electric revenues4,975,000,000
Energy related businesses revenues1,757,000,000
Total revenues13,592,000,000
Depreciation and amortization-2,473,000,000
Income before income taxes and equity earnings1,875,000,000
Income tax expense-181,000,000
Equity earnings1,996,000,000
Net income3,690,000,000
Net income attributable to common shareholders3,062,000,000
Diluted EPS4.67
Cash flow
Operating cash flow5,869,000,000
Capital expenditures-10,738,000,000
Expenditures for investments-2,618,000,000
Free cash flow-4,869,000,000
  • Derivation. fiscal 2025 (FY2025 10-K) plus the nine months ended September 30, 2026 less the nine months ended September 30, 2025 (Q3 2026 10-Q)

Adjustments

Splits appliednone
Splits noteSempra completed a 2-for-1 stock split in August 2023. Every per-share figure and share count in the FY2025 10-K and the Q3 2026 10-Q is already presented on a post-split basis by the company, so no adjustment was made.
ADR ration/a
FXn/a

Notes

  • Schema: Sempra is a utility holding company (its California utilities SDG&E and SoCalGas, its equity-method investment in Oncor in Texas, and Sempra Infrastructure), so the record uses a utility layout rather than a revenue-less-cost-of-sales frame. Revenues follow the income statement's own categories (utility natural gas, utility electric, and energy-related businesses); expenses are shown by nature as printed; equity earnings, which include Sempra's share of Oncor, are shown separately. The company reports no gross profit or operating income line, and none is calculated here.
  • Sources: the fiscal years 2025, 2024 and 2023 come from the FY2025 Form 10-K (accession 0001032208-26-000010), whose statements of operations and cash flows present all three years and whose balance sheet presents December 31, 2025 and 2024 only, so FY2023 carries no balance sheet. The third quarters of 2026 and 2025, the nine-month periods, and the September 30, 2026 balance sheet come from the Form 10-Q for the quarter ended September 30, 2026 (accession 0001032208-26-000054). The December 31, 2025 balance sheet column printed in that 10-Q agrees with the 10-K on every line carried here.
  • The 10-Q's statement of operations prints four columns: the three months ended September 30, 2026 and 2025 and the nine months ended September 30, 2026 and 2025. The three-month columns are the Q3 2026 and Q3 2025 entries; the nine-month columns are held in the year-to-date block and its prior-year comparative and are never presented as quarters. No September 30, 2025 balance sheet is printed, so Q3 2025 has none.
  • Signs follow the filing: revenues, income and cash inflows are positive; expenses, income tax expense, interest expense, amounts attributable to noncontrolling interests, preferred dividends and cash outflows (capital expenditures, dividends paid, debt repayments) are negative, exactly as the statements print them in parentheses. Depreciation and amortization is therefore negative on the income statement and positive as an add-back on the cash flow statement.
  • net_income is consolidated net income, including the share belonging to noncontrolling interests. net_income_attributable_to_common_shareholders is the statement's 'Earnings attributable to common shares', the figure earnings per share is struck on: net income less earnings attributable to noncontrolling interests and to the contingently redeemable noncontrolling interest, and less preferred dividends and preferred deemed dividends. In FY2025 the 10-K labels the contingently redeemable noncontrolling interest line 'Losses attributable to', and the positive $3 million it shows is a loss absorbed by that interest; the 10-Q labels the same line 'Earnings attributable to'. Both are carried under one name with the filing's sign.
  • regulatory_disallowances is the line the 10-K prints as 'Regulatory disallowances' and the 10-Q as 'Regulatory disallowances, net'. gain_on_sales appears only in 2026 ($214 million in the third quarter); the quarter included the August 2026 sale of Ecogas México by Sempra Infrastructure Partners.
  • Weighted-average share counts are printed in thousands and are stored here as actual shares. common_shares_outstanding is the period-end count printed in the balance sheet's common stock caption. dividends_declared_per_common_share is taken from the statements of changes in contingently redeemable noncontrolling interest and equity.
  • total_debt is calculated here as short-term debt plus the current portion of long-term debt and finance leases plus long-term debt and finance leases, as printed on the balance sheet; it is not a line the company reports. It does not include the debt of the Sempra Infrastructure Partners disposal group, which the balance sheet reports within liabilities held for sale. total_liabilities is likewise calculated (total current liabilities plus long-term debt and finance leases plus total deferred credits and other liabilities); the balance sheet does not print a total-liabilities line. Total assets equal total liabilities plus the contingently redeemable noncontrolling interest (carried as redeemable_noncontrolling_interest) plus total equity, which includes other noncontrolling interests and preferred stock of a subsidiary.
  • capital_expenditures is the cash flow statement's 'Expenditures for property, plant and equipment'. expenditures_for_investments, shown separately, consists mainly of capital contributions to Oncor and is not included in capital expenditures. free_cash_flow is calculated here as net cash provided by operating activities less expenditures for property, plant and equipment; it is not a measure the company reports.
  • Quarterly cash flows are derived, not filed: the Q3 2026 10-Q presents cash flows for the nine months only. The three-month operating cash flow, capital expenditures and expenditures for investments are the nine-month figures in that 10-Q less the six-month figures in the second-quarter 2026 earnings release (Form 8-K, accession 0001032208-26-000043). The resulting capital expenditures ($2,640 million in Q3 2026; $2,561 million in Q3 2025) and expenditures for investments ($610 million; $520 million) match the three-month amounts printed in the third-quarter 2026 earnings release (Form 8-K, accession 0001032208-26-000051). Net income in the six-month and nine-month cash flow statements reconciles to the third-quarter net income on the income statement in both years.
  • The trailing twelve months ended September 30, 2026 is a derived view, not a filed column: fiscal 2025 plus the nine months ended September 30, 2026 less the nine months ended September 30, 2025, line by line from the 10-K and the 10-Q. Its diluted earnings per share of $4.67 is the same combination of the published per-share amounts ($2.75 plus $4.13 less $2.21); no twelve-month weighted-average share count is published, so none is shown. No balance sheet is shown for this view; the relevant one is at September 30, 2026.
  • Held for sale: at December 31, 2025 and September 30, 2026 the assets and liabilities of Sempra Infrastructure Partners were classified as held for sale ($33,552 million of assets and $13,118 million of liabilities at September 30, 2026) because of the agreed sale of a 45% interest to affiliates of KKR. The businesses were not presented as discontinued operations, so their results remain in every income statement and cash flow period here. A Form 8-K filed November 12, 2026 (accession 0001032208-26-000057) reports that the sale closed that day and that Sempra deconsolidated SI Partners; that is after every period in this record and none of the figures here reflect it.

Uncertainties

  • The Q3 2026 and Q3 2025 operating cash flow and free cash flow rest on six-month figures taken from the second-quarter 2026 earnings release (accession 0001032208-26-000043) rather than from a Form 10-Q. The capital expenditure figures are corroborated by the third-quarter release, but no filed statement prints a three-month operating cash flow.
  • The trailing-twelve-month diluted EPS of $4.67 is an arithmetic combination of reported per-share amounts, not a figure the company reports.

Company details

NameSempra
TickerSRE
CIK0001032208
ExchangeNYSE
StateCalifornia
IncorporationCalifornia
SIC4932
OfficeEnergy & Transportation
IndustryGas & Other Services Combined

Fiscal period

Fiscal year2026
Fiscal periodQ3
TagFY26Q3
Period end2026-09-30
Form10-Q
Accession0001032208-26-000054
Fiscal year end1231
Sourcederived

Source filings

RoleCurrentFormFiscal yearFiscal periodTagPeriod endFiledAccessionSource
annualno10-K2025FYFY252025-12-312026-02-260001032208-26-000010reported
quarterlyyes10-Q2026Q3FY26Q32026-09-302026-11-050001032208-26-000054derived

Related companies

See every covered company and its filings data.

Not investment advice, see the Disclaimer.