# Sempra (SRE) — Business, Risks and Management Discussion, Third Quarter 2026 Sources: the Annual Report on Form 10-K for fiscal 2025 (year ended December 31, 2025; accession 0001032208-26-000010), the Form 10-Q for the quarter ended September 30, 2026 (accession 0001032208-26-000054), and Sempra's 2026 current reports on Form 8-K, cited by accession where used. All amounts are in US dollars. "Earnings" means earnings attributable to common shares, as Sempra reports it. ## Business *From the FY2025 10-K (accession 0001032208-26-000010), updated where noted for 2026 transactions.* Sempra is a holding company whose earnings come overwhelmingly from regulated electric and natural gas utilities in California and Texas. In California it owns San Diego Gas & Electric (SDG&E) and Southern California Gas Company (SoCalGas), which earn a regulator-authorized return on the capital they invest in pipes, wires and storage. Commodity costs pass through to customers without markup. In Texas it owns 80.25% of Oncor, the state's largest electric transmission and distribution utility, and 50% of Sharyland Utilities. It accounts for both as equity-method investments. Its third business, Sempra Infrastructure, develops and operates LNG export terminals, natural gas pipelines and power assets in the U.S. and Mexico. Sempra sold control of that business to KKR-affiliated investors on November 12, 2026, and now holds it as a 25% equity-method interest (see Subsequent events). Sempra describes its mission as building "America's leading utility growth business," with investment concentrated in California and Texas. In fiscal 2025, Sempra earned $1,796 million in total. Segment earnings were $1,428 million at Sempra California and $861 million at Sempra Texas Utilities, Sempra Infrastructure lost $160 million, and Parent and other lost $333 million. The three reportable segments: - **Sempra California: SDG&E.** SDG&E provides electricity to a population of about 3.6 million and natural gas to about 3.3 million of them, across roughly 4,100 square miles of San Diego County and southern Orange County. Its system includes 2,018 miles of transmission lines, 24,210 miles of distribution lines and 158 substations. Most of its customers now buy their electric commodity from community choice aggregators or direct-access providers, so for them SDG&E mainly earns on delivery. It earns no return on commodity sales volumes. SDG&E also owns 20% of the San Onofre nuclear plant, which closed in 2013 and is being decommissioned. - **Sempra California: SoCalGas.** SoCalGas is a gas distribution, transmission and storage utility serving a population of about 21.3 million across about 24,000 square miles of Southern and central California. Its network has 52,765 miles of distribution pipeline, and its four storage fields hold 137 Bcf of working gas. Aliso Canyon accounts for 86 Bcf (63%) of that capacity, of which the CPUC currently authorizes 68.6 Bcf. A gas-cost incentive mechanism lets SoCalGas share savings or costs when it buys gas below or above market benchmarks. - **How the California utilities earn.** The CPUC sets base revenue requirements in multi-year General Rate Cases (GRCs). It sets the authorized return in a cost-of-capital proceeding every three years, with an automatic adjustment mechanism between proceedings. For 2026–2028 the CPUC kept a 52% equity layer and authorized returns on equity of 9.93% for SDG&E and 9.78% for SoCalGas. The FERC separately regulates SDG&E's electric transmission rates. Programs approved outside the GRC, including wildfire-mitigation and pipeline-safety spending, are recovered through later filings that can be reviewed for reasonableness and partly disallowed. - **Sempra Texas Utilities.** Oncor delivers electricity to more than 4.1 million homes and businesses over more than 145,000 circuit miles of line, in a territory of about 14 million people that includes Dallas–Fort Worth, Midland, Odessa and much of north-central, eastern and western Texas. Oncor neither generates nor sells electricity: its revenue is regulated transmission and distribution tariffs set by the Public Utility Commission of Texas (PUCT). "Ring-fencing" commitments mean Sempra does not control Oncor. Seven of the 13 directors on Oncor's board must be independent, and Oncor can withhold dividends. Sempra's earnings from Texas are therefore equity earnings. Sharyland Utilities owns about 64 miles of transmission lines in south Texas. - **Sempra Infrastructure.** This segment comprises the operating companies of Sempra Infrastructure Partners (SI Partners) plus a holding company and certain service companies, in three business lines: - **LNG.** SI Partners owns 50.2% of Cameron LNG Phase 1 in Louisiana: three trains with 13.9 Mtpa of nameplate capacity, fully contracted under 20-year tolling agreements with affiliates of TotalEnergies, Mitsubishi and Mitsui. It owns 83.4% of ECA LNG Phase 1 in Baja California, Mexico, which has 3.25 Mtpa of nameplate capacity and 2.5 Mtpa of initial offtake sold to TotalEnergies and Mitsui. At Port Arthur, Texas, SI Partners owns 28% of the two-train Phase 1 project, about 13 Mtpa nameplate, under construction alongside KKR Denali (42%) and ConocoPhillips (30%). Trains 1 and 2 are expected at or near the end of 2027 and in 2028. It also owns 50.1% of the Phase 2 project (Blackstone holds 49.9%), which reached a positive final investment decision in September 2025 and whose trains 3 and 4 are expected in 2030 and 2031. - **Energy Networks.** About 1,985 miles of natural gas transmission pipeline in Mexico, contracted under long-term, U.S. dollar-based agreements with counterparties such as the CFE, Centro Nacional de Control de Gas and PEMEX. The Ecogas distribution utility in Mexico was sold in August 2026. - **Low Carbon Solutions.** 1,044 MW of operating wind and solar generation, the 625 MW Termoeléctrica de Mexicali (TdM) gas-fired plant, and the approximately 320 MW Cimarrón Wind project, which began commercial operations in March 2026. At the end of 2025, Sempra owned 70% of SI Partners, KKR Pinnacle 20% and ADIA 10%. After the November 2026 sale, the KKR Partners own 65%, Sempra 25% and ADIA 10%. The Guaymas-El Oro segment of the Sonora pipeline in Mexico remains a project Sempra owns and funds alone. ## Risk factors *Condensed from Item 1A of the FY2025 10-K (accession 0001032208-26-000010). The Q3 2026 10-Q (accession 0001032208-26-000054) adds no new risk factors, and later facts from it are labelled as such.* The risks below can materially affect Sempra's earnings, cash flow or credit standing: - **California wildfire liability.** Under California's doctrine of inverse condemnation, a utility whose equipment is found to have caused a fire is liable for the damage even without negligence. Recovery of those costs in rates is not assured. SDG&E relies on the state Wildfire Fund and the $18.0 billion Continuation Account created in 2025, which reimburse participating utilities' claims above $1 billion. Both can be depleted by other utilities' claims. Edison's Eaton fire, a "covered wildfire," could materially reduce or exhaust the Wildfire Fund, which would force SDG&E to write down its Wildfire Fund asset ($260 million at year-end 2025 and $239 million at September 30, 2026). SDG&E's expected share of shareholder contributions to the Continuation Account is $387 million through 2045. Wildfire insurance is getting harder and more expensive to obtain, including the $1.0 billion of primary coverage the legislation requires. SoCalGas also faces litigation over the January 2025 Los Angeles fires; Sempra itself was dismissed from the Palisades case in July 2026. - **Regulatory disallowances and cost recovery.** Large categories of utility spending are recovered only after reasonableness reviews. The January 2026 decision on SDG&E's 2024 GRC Track 2 request approved $1,023 million of $1,472 million of 2019–2022 wildfire-mitigation costs. That decision produced a $651 million pre-tax ($464 million after-tax) charge in the fourth quarter of 2025. Lower allowed returns, an adverse trigger of the cost-of-capital adjustment mechanism, or FERC rulings can also cut earnings. In December 2024 the FERC found SDG&E ineligible for its 0.50% California ISO incentive adder, a ruling SDG&E is appealing, and ordered refunds back to June 2019. - **Natural gas policy and stranded assets.** California policy aims to reduce gas use through electrification and building codes. Lower volumes spread fixed system costs over fewer customers. If gas assets cannot be repurposed or fully recovered, SDG&E and SoCalGas could face impairments and decommissioning costs. A permanent closure of Aliso Canyon could cause a material impairment. - **No control over Oncor.** Ring-fencing commitments limit Sempra's say over Oncor's budgets, dividends and strategy. Oncor must suspend distributions if its senior secured rating falls below BBB at any of the three agencies or if its debt-to-equity ratio would exceed the level the PUCT approved. Oncor's independent directors or the directors designated by its minority owner can also make it retain cash. - **Executing Oncor's build-out.** Oncor's 2026–2030 base capital plan of about $47.5 billion relies heavily on ERCOT's 765-kV transmission expansion and on connecting large loads such as data centers. Projects can be delayed, denied or cancelled, and forecast demand may not materialize. Texas rates are set on a historical test year, so cost increases are recovered with a lag. Oncor depends on external financing, and S&P lowered its ratings in July 2025, citing wildfire risk. - **Capital needs and credit ratings.** The businesses are capital-intensive, and Sempra depends on debt markets, asset sales and equity issuance. At September 30, 2026, Sempra's issuer ratings were Baa2 with a negative outlook at Moody's, BBB+ with a negative outlook at S&P, and BBB+ with a stable outlook at Fitch. The agencies list catastrophic wildfires, adverse California regulatory outcomes, and cost overruns or delays at Port Arthur LNG among potential triggers for downgrades. Keeping current ratings could require issuing more equity, including through the $3.0 billion at-the-market program, or selling more stakes in subsidiaries, which would dilute shareholders. - **Holding-company structure.** Sempra's ability to pay dividends and service its debt depends on distributions from subsidiaries and equity-method investees it does not fully control. Its claims rank behind those of each entity's own creditors. - **The SI Partners sale and what Sempra keeps.** The 10-K warned that the sale cuts Sempra's share of that business's cash flows and hands control to the KKR Partners, who may not manage it as Sempra expects. The Q3 10-Q adds three points. Roughly $5.3 billion of the purchase price is deferred, in instruments issued by indirect equity holders of the KKR Partners that rank behind their subsidiaries' senior debt. Sempra expects to record credit-loss provisions on those notes. And Sempra keeps substantially the same funding obligations as before for cost overruns at ECA LNG Phase 1 and Port Arthur LNG Phase 1. - **LNG construction and contracts.** Projects can run late or over budget. ECA LNG Phase 1 has depended on Mexican and U.S. permit extensions, and its customers gained the right to terminate their contracts when commercial operations did not start by February 24, 2026. Port Arthur Phase 1 is on a greenfield site. The LNG business relies on long-term contracts with a small number of customers. - **Mexico.** Constitutional changes in 2024, the 2025 Energy Laws and their October 2025 regulations increase state control of the energy sector, favor state-owned companies and shorten some permit terms. Elected judges may make contracts with state entities harder to enforce. Sempra also cites expropriation risk, a long-running land dispute next to the ECA Regas Facility, and peso and Mexican-inflation swings that affect income taxes. Deconsolidating SI Partners is expected to reduce that last effect. - **Tariffs and trade.** U.S. tariffs on steel, aluminum, copper and imported equipment such as transformers raise construction and procurement costs. Retaliatory measures, including China's tariff on U.S. LNG, could weaken demand for LNG exports. - **Cyber and technology.** Attacks on utility systems are increasingly sophisticated, including by nation-state actors and with AI tools. Sempra relies more and more on cloud and third-party vendors, and its cyber insurance is limited. - **Other structural exposures.** Sempra could owe substantial taxes if Energy Future Holdings' 2016 spin-off of Vistra is ever deemed taxable as a result of Sempra's 2018 merger with EFH. SI Partners also carries credit and performance risk on its contracts with PEMEX and the CFE. ## Management's discussion: fiscal 2025 *From Item 7 of the FY2025 10-K (accession 0001032208-26-000010). Per-share and adjusted figures are from the fourth-quarter 2025 earnings release furnished with Form 8-K (accession 0001032208-26-000008).* Fiscal 2025 GAAP earnings fell to $1,796 million, or $2.75 per diluted share, from $2,817 million, or $4.42, in 2024. The decline reflects a regulatory disallowance at SDG&E, income tax charges triggered when Sempra classified SI Partners and Ecogas as held for sale in 2025, and adverse Mexican currency and inflation effects. Sempra's non-GAAP adjusted earnings, which exclude those items and Mexican currency effects, were $3,066 million ($4.69 per share) against $2,969 million ($4.65) in 2024. Revenues were $13,702 million, up from $13,185 million. Sempra invested $12.6 billion in capital expenditures and investments. Results by segment: - **Sempra California: earnings down $418 million (23%) to $1,428 million.** The largest item was a $432 million after-tax charge for 2019–2024 costs disallowed under the Track 2 decision. Other drags were $159 million lower income tax benefits, $63 million higher net interest expense and a $25 million write-off of disallowed COVID-19 costs. These were partly offset by $148 million higher CPUC base operating margin and by the absence of an $89 million FERC transmission refund charge recorded in 2024. - **Sempra Texas Utilities: earnings up $80 million (10%) to $861 million.** Higher Oncor revenues came from the new Unified Tracker Mechanism (UTM), rate updates for invested capital, customer growth and a larger energy-efficiency bonus. They were partly offset by higher interest, depreciation and operating costs. Texas legislation in June 2025 created the UTM, which lets Oncor seek one interim rate update a year through 2035 for transmission and distribution investment. - **Sempra Infrastructure: a $160 million loss versus $911 million of earnings in 2024.** The swing came mainly from $703 million of income tax expense on classifying SI Partners and Ecogas as held for sale. A $445 million adverse swing in foreign currency and inflation effects on Mexican monetary positions also contributed. Higher asset and supply optimization income (+$52 million), lower credit-loss provisions and the halt of depreciation on held-for-sale assets partly offset these. - **Parent and other: losses narrowed by $388 million to $333 million.** The main reasons were smaller tax valuation-allowance charges than in 2024 and a $191 million net tax benefit tied to the held-for-sale classification, partly offset by $92 million higher net interest expense. Consolidated interest expense rose $483 million (46%) to $1.5 billion, mainly from unrealized swings on Port Arthur LNG Phase 1 interest rate swaps and higher debt balances. Equity earnings held at about $1.6 billion. In 2025 Sempra signed the two capital-recycling deals that shape 2026. In September it agreed to sell 45% of SI Partners to the KKR Partners for $9.99 billion, subject to adjustments. In December it agreed to sell Ecogas for 9.0 billion Mexican pesos. It also redeemed its $900 million of series C preferred stock in October 2025. California passed 2025 wildfire legislation creating the Continuation Account. Oncor filed a comprehensive rate review, which it settled in January 2026. The 10-K projected capital expenditures and investments of about $8.6 billion in 2026 and $38.7 billion for 2026–2030. On a different basis, which includes Sempra's proportionate share of capital spending at equity-method investees such as Oncor and excludes the shares of noncontrolling partners, the projection was $64.9 billion of capital expenditures for 2026–2030. The fourth-quarter earnings release presented this as a record capital plan of about $65 billion, more than 95% of it for regulated utilities. ## Current period: third quarter and first nine months of 2026 *From the Q3 2026 10-Q (accession 0001032208-26-000054) and the third-quarter earnings release furnished with Form 8-K (accession 0001032208-26-000051).* Third-quarter GAAP earnings were $877 million, or $1.34 per diluted share, compared with $77 million ($0.12) a year earlier. The prior-year quarter carried a $514 million tax charge from the held-for-sale classification. For the nine months, earnings were $2,710 million ($4.13) versus $1,444 million ($2.21). Adjusted earnings, a non-GAAP measure, were $917 million ($1.40) in the quarter versus $728 million ($1.11), and $2,670 million ($4.07) for the nine months versus $2,253 million ($3.45). Quarterly revenues were $3,191 million against $3,151 million; nine-month revenues were $9,843 million against $9,953 million. Earnings by segment: | Earnings ($ millions) | Q3 2026 | Q3 2025 | 9M 2026 | 9M 2025 | |---|---|---|---|---| | Sempra California | 223 | 370 | 1,240 | 1,353 | | Sempra Texas Utilities | 460 | 306 | 977 | 660 | | Sempra Infrastructure | 346 | (580) | 838 | (362) | | Parent and other | (152) | (19) | (345) | (207) | | Total | 877 | 77 | 2,710 | 1,444 | What drove the quarter: - **California fell 40%, almost entirely because of a regulatory charge.** Q3 included a net $205 million pre-tax ($151 million after-tax) charge for regulatory disallowances, of which $202 million ($149 million after tax) related to prior years. The CPUC's proposed decisions on the 2024 GRC Track 3 requests led SoCalGas to record a $217 million charge for pipeline-safety costs. SDG&E recorded a $104 million credit, partly reversing its 2025 Track 2 charge, after a proposed decision approved a settlement reducing its requested wildfire-mitigation revenue requirement from $766 million to $621 million. A proposed decision on SoCalGas's transmission integrity program led to a further $92 million charge. Partly offsetting it, CPUC base operating margin rose $38 million. - **Texas rose 50% on Oncor's new rates.** The PUCT's April 2026 order in Oncor's rate review raised its annual revenue requirement by about $560 million and set a 43.5% equity ratio (up from 42.5%) and a 9.75% return on equity (from 9.70%). New rates took effect June 1, 2026, and a surcharge recovering the January–May difference began August 1. Second-quarter results included about $50 million after tax attributable to the first quarter. The UTM mechanism and higher weather-driven consumption also contributed. Oncor set a system peak of 33.3 GW, and in April it filed its first UTM application, covering about $4.4 billion of 2025 investment. - **Infrastructure swung to a profit.** The main reasons were the absence of last year's $705 million deferred tax charge and a $98 million favorable swing in Mexican currency and inflation effects. A $97 million after-tax, after-noncontrolling-interest gain on the August 2026 Ecogas sale also helped ($198 million pre-tax; proceeds of 9.0 billion pesos, or $524 million net). So did $32 million lower depreciation on held-for-sale assets and the absence of 2025 contract-termination costs. Asset and supply optimization income fell $50 million on unrealized derivative losses. - **Parent and other.** Losses widened by $133 million, mainly because Q3 2025 had included $191 million of net tax benefits that did not recur. Operating developments in the nine months: - **ECA LNG Phase 1** exported its first cargo on July 7, 2026, during commissioning. A planned inspection afterward found damage to its refrigerant and boil-off gas compressors. Sempra now expects substantial completion in the fourth quarter of 2026, with long-term sales starting shortly after. The customers' contractual termination right remains open, though none had given notice as of November 5, 2026. - **Port Arthur LNG Phase 2.** In September 2026 SI Partners signed a 20-year agreement to supply Petrobras with 0.8 Mtpa. Total Phase 2 capital spending is still estimated at about $14 billion, including a $1.9 billion payment to Phase 1 for a 50% share of common facilities. The Port Arthur Pipeline Louisiana Connector went into service in June 2026. In April, Port Arthur LNG I issued $2.0 billion of 6.43% senior secured notes due 2048 to repay part of its term loan. - **SDG&E.** The FERC approved SDG&E's TO6 transmission settlement in June 2026, and SDG&E recognized its retroactive impact in the second quarter. In July, after CPUC approval, SDG&E bought Westside Canal 2A, LLC, owner of a 119 MW battery storage facility in Imperial County, California, from a subsidiary of RWE AG. The total price is $205 million: $195 million paid in cash and $10 million due on post-closing milestones. SDG&E's union contracts were extended to August 2029. In September the California Supreme Court declined review of the City of San Diego franchise challenge, which ended that case in SDG&E's favor. - **Texas transmission build-out.** In August 2026 the PUCT approved a Permian Basin 765-kV line Oncor will build, subject to rehearing and appeal; a separate joint-line application received a recommendation for denial. ERCOT's batch interconnection process for large loads, now subject to a data-center audit ordered by the Governor of Texas, conditionally classified about 24 GW of large load in Oncor's area as base load and 21 GW as studied load. Financing and liquidity. Besides note and first mortgage bond offerings at Sempra, SDG&E and SoCalGas that mainly refinanced maturities and commercial paper, Sempra borrowed $1.0 billion under a new 364-day term loan facility in July and September 2026. At September 30, 2026, Sempra's committed credit lines totaled $10.0 billion, with about $8.0 billion unused. Outlook. The November 5 release made these changes: - 2026 GAAP EPS guidance was updated to $7.41–$8.41, from $5.02–$5.55 in August. - Sempra expects 2026 adjusted EPS at the high end of its $4.80–$5.30 range. - 2027 EPS guidance of $5.10–$5.70 was affirmed, but results could fall in the lower half. On October 29 the CPUC proposed denying the utilities' request to correct the 2024 GRC post-test-year capital mechanism. If that stands, Sempra California expects its 2027 earnings at the low end of its segment range unless mitigated. - The 7%–9% long-term EPS growth rate was affirmed. Capital expenditures for 2026 are now expected at about $12.1 billion, up from $8.6 billion, because the later SI Partners closing kept Sempra consolidating that business's spending longer. Oncor expects its 2027–2031 base capital plan to be about 20% above its $47.5 billion 2026–2030 plan. ## Subsequent events *Events after September 30, 2026, from the Q3 10-Q (accession 0001032208-26-000054; filed November 5, 2026) and Form 8-K filed November 12, 2026 (accession 0001032208-26-000057).* - **SI Partners stake sale closed (November 12, 2026).** Sempra completed the sale of a 45% equity interest in Sempra Infrastructure Partners, LP to entities owned by affiliates of Kohlberg Kravis Roberts & Co. L.P. and co-investor Canada Pension Plan Investment Board. The base price agreed in September 2025 was $9.99 billion. Sempra received $4.56 billion in cash at closing, subject to post-closing adjustments. The remainder is deferred in two pieces: - $4.14 billion plus 7.5% interest compounded quarterly, maturing December 31, 2027 ($4.51 billion in total). These instruments are supported by equity commitment letters from investors in the KKR Partners. - $1.20 billion of promissory notes bearing 8.5% interest compounded quarterly until January 1, 2031 and 10.0% thereafter, maturing February 11, 2034 ($2.31 billion if held to maturity). Sempra expects a pre-tax gain of about $2.80–$3.30 billion ($2.00–$2.40 billion after tax). It also expects about $450–$550 million ($325–$400 million after tax) of transaction-related costs, including credit-loss provisions on the notes and a reimbursement to ADIA. Ownership is now KKR Partners 65%, Sempra 25%, ADIA 10%. Sempra deconsolidated SI Partners effective November 12, 2026 and now accounts for its 25% under the equity method within the Sempra Infrastructure segment. Under the new partnership agreement Sempra appoints two of seven managers. It cannot transfer its interest before January 1, 2029. - **Norte fire (October 16, 2026).** A fire near San Clemente, California, damaged or destroyed seven homes, according to the Orange County Fire Authority. SDG&E had an outage involving its electrical facilities in the area the same day. The causes of the fire and of the outage are both unknown and under investigation. On October 19 a lawsuit was filed against SDG&E, Enova Corporation and Sempra alleging that SDG&E's facilities caused the fire. It claims negligence and inverse condemnation and seeks punitive damages. Sempra says it cannot estimate the outcome. - **Wildfire Fund drawdowns (October 2026).** PG&E disclosed about $1.38 billion of Wildfire Fund reimbursements. Edison disclosed about $859 million for the Eaton fire, which investigators found was caused by Edison's equipment. SDG&E cannot estimate the potential loss from reduced fund coverage, and a material depletion could require a write-down of its $239 million Wildfire Fund asset. - **CPUC decisions (October 2026).** - On October 29 the CPUC approved a revised proposed decision on SoCalGas's transmission integrity costs that cuts the disallowance by about $30 million. The third-quarter charge may therefore change once SoCalGas's advice letter is approved. - Separately, a proposed decision would deny the 2024 GRC petition for modification. The petition sought, for SDG&E, $55 million, $87 million and $79 million and, for SoCalGas, $86 million, $122 million and $109 million of added revenue requirement for 2025–2027. A final decision is expected in the fourth quarter. - **Port Arthur LNG Phase 2 contract change (October 2026).** A change order adding a nitrogen rejection unit raised the Bechtel engineering, procurement and construction price to about $10 billion, from $9.2 billion. Total project capital spending is still estimated at about $14 billion. - **Term loan extension (October 13, 2026).** Sempra extended the maturity of its $1.75 billion 364-day term loan to December 24, 2026. - **Port Arthur construction-incident litigation.** In August 2026 the claims from the April 2025 incident that killed three Bechtel workers were settled in principle. As of November 2, 2026, the claims of 10 of 26 plaintiffs had been fully resolved and dismissed. Bechtel is indemnifying under its construction contract.