# Consolidated Edison, Inc. (ED) — Business Narrative, FY26Q3 (quarter ended September 30, 2026) Con Edison's annual and quarterly reports are combined filings of two registrants: Consolidated Edison, Inc. (the NYSE-listed holding company, "Con Edison") and its principal subsidiary, Consolidated Edison Company of New York, Inc. ("CECONY"). Unless a figure below is labelled as CECONY, O&R or Con Edison Transmission, it is the Con Edison, Inc. consolidated amount. All amounts are in US dollars. ## Business *Source: FY2025 Form 10-K, accession 0001047862-26-000031.* Con Edison is a regulated energy-delivery holding company. It earns its money by building and owning the wires, pipes and steam mains that serve New York City, Westchester County and adjacent parts of southeastern New York and northern New Jersey, and by collecting regulator-approved delivery rates that return its costs plus an allowed return on the capital invested (rate base). It buys and passes through the electricity and gas its full-service customers use at cost — it "does not make any margin or profit" on the energy itself — so earnings growth comes almost entirely from growing rate base. In 2025 the regulated utilities produced $2,014 million of Con Edison's $2,023 million net income for common stock and $16,916 million of its $16,918 million operating revenues. Con Edison had 15,407 employees at December 31, 2025, including 14,166 at CECONY. The company has three businesses: - **CECONY (about 93% of 2025 revenue and 94% of net income).** Provides electric service to approximately 3.7 million customers in all of New York City (except part of Queens) and most of Westchester County, a service area of roughly 660 square miles and more than nine million people; gas delivery to approximately 1.1 million customers in Manhattan, the Bronx, parts of Queens and most of Westchester (the Q3 2026 10-Q puts this at approximately 1.0 million); and the largest steam distribution system in the United States, delivering about 16,975 MMlb a year to roughly 1,490 customers in Manhattan. Its 100,371 miles of underground distribution lines form the longest underground electric delivery system in the country. CECONY's electric and gas delivery revenues are protected by revenue decoupling (and a weather-normalization clause for gas and steam), so delivery revenues are generally not affected by changes in volumes from the levels assumed in rates. - **Orange and Rockland Utilities (O&R, about 7% of revenue, 5% of net income).** Together with its New Jersey subsidiary Rockland Electric Company (RECO), serves approximately 0.3 million electric customers in southeastern New York and northern New Jersey and over 0.1 million gas customers in southeastern New York. O&R owns no generation. - **Con Edison Transmission.** A FERC-regulated developer and investor in electric transmission, principally through 45.7% interests in New York Transco's TOTS and New York Energy Solution projects (base ROE 9.99% plus incentive adders) and 41.7% of New York Transco's share of the Propel NY Energy project — a 90-mile line connecting Long Island to the rest of the state, being built jointly with the New York Power Authority, with New York Transco's share of cost estimated at $2,200 million and an anticipated 2030 in-service date. At the time of the 10-K it also held a roughly 6.6% interest in the Mountain Valley Pipeline (MVP) and a 71.2% stake in the Honeoye gas storage company (CECONY held the rest); both were sold during 2026 (see Current quarter and Subsequent events). **Regulation and the rate-plan model.** The New York State Public Service Commission (NYSPSC) sets the Utilities' New York rates in multi-year rate plans; rates generally cannot change during a plan's term other than for specified adjustments. Allowed return on equity is set by formula (two-thirds weight to a dividend-discount model, one-third to a capital asset pricing model applied to peers). In January 2026 the NYSPSC approved new three-year CECONY electric and gas rate plans (January 2026 through December 2028) with an authorized ROE of 9.40%: electric rate increases of $222 million, $473 million and $329 million and gas rate changes of $(46) million, $170 million and $93 million, implemented on a levelized ("shaped") basis at a constant total bill impact of 2.80% (electric) and 2.01% (gas) each year. The gas plan places $33.3 million a year ($100 million over 2026–2028) of revenue requirement subject to refund pending the state's review of non-conforming gas main welds. The electric transmission projects Con Edison Transmission invests in, and the Utilities' transmission rates and short-term borrowings, are FERC-regulated; RECO is regulated by the New Jersey Board of Public Utilities (NJBPU). **Strategy and growth.** Con Edison describes its goal as dividend growth supported by earnings growth in regulated utilities and electric transmission. New York's Climate Leadership and Community Protection Act (CLCPA) and New York City's Climate Mobilization Act are expected to raise electric usage and shrink gas and steam usage over time; CECONY projects $72 billion of capital expenditures will be needed between 2025 and 2034 to implement its clean-energy strategy. The 10-K plan calls for Utility capital investment of $6,533 million in 2026, rising to $8,571 million in 2030, plus Con Edison Transmission investment of $62 million to $213 million a year. Funding is planned from internal cash, up to $3,200 million of Utility long-term debt in 2026 and $3,000 million in 2027, and up to $1,100 million of new common equity in 2026 (approximately $1,200 million in 2027 and up to $3,300 million over 2028–2030), in addition to equity issued under dividend-reinvestment and employee plans. ## Risk factors *Source: FY2025 Form 10-K, Item 1A, accession 0001047862-26-000031. The Q3 2026 Form 10-Q (accession 0001047862-26-000155) reports no material changes to these risk factors.* The risks that matter most for a regulated, capital-hungry New York utility: - **Regulatory return and penalties.** Rate plans are designed for, but do not guarantee, recovery of costs and a reasonable return; actual costs can exceed levels in rates, and regulators can disallow costs judged imprudent (including storm restoration). The NYSPSC can impose material penalties and, for repeated violations, even revoke a combination gas and electric utility's operating certificate. Rate plans include negative revenue adjustments for missed operating and customer-service targets. - **Rate-plan renewal and affordability.** New plans must be negotiated as old ones expire; rising commodity costs, taxes and state-mandated surcharges compete with the need for affordable bills and can impair the opportunity to obtain a reasonable return. Aged customer receivables — still far above pre-pandemic levels — weigh on liquidity even though write-offs are reconciled through rates. - **Facility failure in dense urban areas.** Much of the system runs in or near densely populated public places; a failure, explosion or extended outage could cause injury or death, property damage and penalties, with costs that may exceed insurance. Climate impacts (storm surge, inland flooding, extreme heat and cold) heighten this risk. Tariffs require compensation to customers for widespread outages lasting more than 72 hours, costs that are not recoverable from customers. - **Cyber attack.** As critical infrastructure the Companies face nation-state and criminal threats; they have experienced incidents before (none material), and a significant attack could disrupt operations, compromise customer data and bring penalties and litigation. Artificial intelligence is flagged as a new source of both operational risk and cost. - **People, processes and contractors.** Heavy reliance on contractors for system work exposes the company to misconduct and fraud — illustrated by the falsified weld-film matter described below — and to competition for skilled labour. - **Environmental liabilities and climate policy.** CECONY is investigating or remediating 51 former manufactured-gas-plant sites (estimated undiscounted liability $645 million to $2,550 million, excluding the Astoria site at $291 million to $962 million) and is a potentially responsible party at the Gowanus Canal and Newtown Creek Superfund sites, where it cannot estimate its exposure. Emissions mandates require heavy capital spending, and future federal climate policy is unpredictable. - **Holding-company structure.** Con Edison depends on dividends from its subsidiaries to pay its own dividends and interest; the NYSPSC limits Utility dividends to 100% of income available for dividends on a two-year rolling average. - **Capital-market access.** The Utilities expect to spend more than $37,100 million on capital over five years, well beyond internally generated funds, so changes in market conditions or credit ratings could raise the cost of, or restrict access to, new capital. Tax-law changes could also affect cash flow and credit metrics. - **Wholesale energy and supply chain.** Nearly all energy sold is bought in wholesale markets; extreme cold can disrupt interstate gas pipelines and cause large-scale gas outages. Supply-chain shortages, inflation and tariffs have raised prices and lead times for transformers and other equipment, potentially beyond levels reflected in rates. - **Strategic and external.** Electrification, distributed energy resources and efficiency are expected to reduce gas and steam usage, threatening the long-run value of those networks; weather, terrorism and economic conditions can affect demand and customers' ability to pay. ## Management's discussion: fiscal 2025 *Source: FY2025 Form 10-K, Introduction and Item 7, accession 0001047862-26-000031.* Con Edison reported 2025 net income for common stock of $2,023 million, or $5.66 a share ($5.64 diluted), up from $1,820 million, or $5.26 a share ($5.24 diluted), in 2024, on operating revenues of $16,918 million (2024: $15,256 million). Adjusted earnings (non-GAAP) were $2,038 million, or $5.70 a share, versus $1,868 million, or $5.40. Adjusted earnings were above reported in 2025 mainly because the company excluded charges at Con Edison Transmission — $12 million after-tax of transaction costs for the review of strategic alternatives for MVP and Honeoye, a $10 million after-tax impairment of Honeoye and a $7 million remeasurement of deferred state taxes on the earlier MVP impairment — partly offset by excluding $9 million of after-tax income from accretion of the MVP basis difference and a $3 million after-tax gain on the sale of an interest in a solar project. The $203 million year-over-year increase in reported earnings came from: - **CECONY, +$158 million ($0.28 a share):** higher electric rate base (+$97 million), higher allowance for funds used during construction (+$31 million), higher gas rate base (+$20 million) and the absence of a 2024 charge after regulators denied capitalisation of costs for a new billing system (+$37 million), offset by higher interest expense (−$38 million). Share issuance diluted EPS by $0.18. - **O&R, +$4 million:** a gas base-rate increase, partly offset by higher interest expense. - **Con Edison Transmission, −$31 million:** the MVP/Honeoye transaction costs, Honeoye impairment and deferred-tax remeasurement described above. - **Other, +$72 million:** chiefly the absence of 2024 loss adjustments related to the 2023 sale of the Clean Energy Businesses (+$51 million). At CECONY, electric operating revenues rose $953 million, reflecting the electric rate plan ($584 million) and pass-through of higher purchased-power and fuel costs; taxes other than income taxes rose $287 million in electric (mainly property taxes) and remain one of CECONY's largest expenses at $3,655 million. Weather-adjusted electric deliveries in CECONY's service area rose 2.5% and firm gas volumes 6.5%, while steam fell 3.4%. **Cash flow and liquidity.** Net cash from operating activities was $4,800 million (2024: $3,614 million), helped by lower taxes receivable, higher other current liabilities and lower customer receivables. Utility capital expenditures were $4,764 million on a cash basis; in capital-plan terms the Utilities invested $4,946 million and Con Edison Transmission $50 million. Financing included CECONY's $900 million and O&R's $250 million debenture issues in 2025 and higher common share issuance. Aged receivables remain the standout liquidity drag: at December 31, 2025 CECONY carried $1,427 million of receivables more than 60 days old within $2,970 million of customer receivables, against $408 million aged within $1,322 million at February 28, 2020; the company's allowance for uncollectible accounts rose from $70 million in 2020 to $507 million in 2025. **Tax.** Con Edison is subject to the 15% corporate alternative minimum tax. IRS Notice 2026-7 (February 18, 2026), allowing certain repair expenditures to be deducted, was expected to produce refunds of about $45 million and significantly reduce future alternative-minimum-tax liability. **Outlook at year-end.** Management highlighted the new CECONY electric and gas rate plans, CECONY's November 2025 request for a $66 million steam rate increase effective November 2026, a NYISO-identified New York City reliability need beginning in summer 2026, and CECONY's projection of New York City reliability needs of 125 MW from 2032 rising to 750 MW by 2036. ## Current quarter: Q3 2026 *Sources: Q3 2026 Form 10-Q, accession 0001047862-26-000155; Q3 2026 earnings release and presentation (Form 8-K Exhibits 99.1 and 99.2), accession 0001047862-26-000157.* **Results.** Third-quarter operating revenues were $4,913 million, up from $4,530 million, and operating income rose to $1,170 million from $968 million. Net income was $766 million, or $2.07 a share basic ($2.06 diluted), against $688 million, or $1.91 ($1.90 diluted), a year earlier. For the nine months, revenues were $14,078 million (2025: $12,924 million) and net income $1,998 million, or $5.44 a share basic ($5.42 diluted), against $1,726 million, or $4.84 ($4.83 diluted). Average basic shares rose to 370.1 million in the quarter from 360.7 million as equity was issued to fund the capital plan. **What drove the quarter.** The $78 million increase in third-quarter net income ($0.16 a share) came almost entirely from CECONY, whose net income rose $80 million to $719 million on higher electric rate base (+$62 million), higher allowance for equity funds used during construction (+$9 million) and lower health care costs (+$8 million); new shares diluted EPS by $0.05. O&R added $3 million (net income $44 million), mainly from an electric base-rate increase. Con Edison Transmission's net income fell $5 million to $6 million, because investment income from MVP ended with the sale. Revenue growth in the quarter was largely pass-through: CECONY electric revenues rose $340 million, of which $137 million reflected higher purchased-power costs, alongside $78 million from the electric rate plan. Other income declined, driven at CECONY by $60 million lower credits from non-service pension and retiree-benefit costs, and income taxes rose $54 million at CECONY on higher pre-tax income. **Nine-month drivers.** Year-to-date net income rose $272 million ($0.60 a share). CECONY contributed +$142 million (electric rate base +$99 million, gas rate base +$29 million, AFUDC +$15 million; dilution −$0.14 a share) and O&R +$9 million. Con Edison Transmission contributed +$125 million, essentially the $134 million after-tax gain on the MVP sale. **Adjusted earnings and guidance.** Reported and adjusted results were identical in Q3 2026 at $766 million, or $2.07 a share. In Q3 2025 adjusted earnings ($686 million, $1.90) were $2 million below reported because that period's MVP basis-difference accretion — income — was excluded. For the nine months, adjusted earnings were $1,864 million, or $5.08 a share, against reported $1,998 million ($5.44): adjusted is lower chiefly because the $189 million pre-tax ($134 million after-tax, $0.37 a share) gain on the MVP sale is excluded, along with $2 million after-tax of MVP accretion income and $1 million of HLBV income, partly offset by adding back $3 million after-tax of transaction costs. Prior-year nine-month adjusted earnings were $1,718 million, or $4.82. Con Edison narrowed its 2026 adjusted EPS guidance to $6.05–$6.15 from $6.00–$6.20. **Sale of the Mountain Valley Pipeline interest — completed.** Con Edison Transmission completed the sale of its approximately 6.6% equity interest in MVP to MVP's two founding members during the first quarter of 2026, for total aggregate consideration of $357.5 million before closing adjustments and expenses. About 40% of the interest was sold in January 2026 and the Q1 2026 earnings presentation (accession 0001047862-26-000092) states the sale was completed in March 2026. The transaction generated $358 million of investing cash inflow and a pre-tax gain of $189 million ($134 million after-tax). MVP had been a troubled investment: Con Edison had capped its cash contributions at about $530 million in 2019, and the investment's carrying value was $168 million at December 31, 2025. With the sale, the MVP equity income that Con Edison Transmission previously recorded has ended. **Regulatory developments in the quarter.** - *CECONY steam.* On September 4, 2026, CECONY, the Department of Public Service staff and other parties filed a joint proposal for a three-year steam rate plan (November 2026–October 2029) with base rate increases of $13 million, $42 million and $39 million, a 9.5% ROE and a 48% equity ratio, levelized at a 3.5% annual bill impact. CECONY had requested $66 million with a 9.9% ROE. The proposal awaited NYSPSC approval when the 10-Q was filed; new rates are effective November 1, 2026, with billing at the new rates to begin on approval and any shortfall recovered by surcharge. Reflecting the proposal, Con Edison reduced its capital requirement estimates for 2027, 2028 and 2029 to $7,489 million, $7,877 million and $8,546 million. - *RECO.* The NJBPU approved a $15.25 million electric rate increase, effective July 1, 2026, with a 9.6% ROE. - *New York affordability law (Chapter 58 of the Laws of 2026).* Enacted in May 2026 and effective for base-rate filings after January 1, 2027, it requires utilities to file an alternative "budget-constrained" plan that holds revenue increases to three-year average CPI growth; directs return of earnings above the authorized ROE (retaining up to 0.25 percentage points if criteria are met); extends the NYSPSC's suspension period to 14 months; authorizes multi-year litigated plans; and allows ROE adjustments tied to affordability performance. The Utilities are still assessing the impact on their projections and the timing of their next rate filings. The same budget amended the CLCPA, extending to December 31, 2028 the deadline for implementing regulations. - *Cyber and AI.* New NYSPSC cybersecurity regulations took effect June 1, 2026, with incremental compliance costs subject to deferral and review in future rate proceedings; in September 2026 the NYSPSC opened a proceeding on utilities' use of AI systems. - *Reliability.* CECONY's July 2026 Reliability Needs Report projects New York City needs of 125 MW from 2033 rising to 675 MW by 2036 — one year later and smaller than its January 2026 estimate — and its reliability contingency plan emphasises competitive procurement of battery storage. **Liquidity and financing.** The 10-Q prints cash flows only for the nine months. For the nine months ended September 30, 2026, operating cash flow was $2,825 million (2025: $3,320 million), lower mainly because of higher other receivables and taxes receivable, the latter partly reflecting federal refunds on amended returns not yet received. Utility capital expenditures rose to $4,051 million from $3,460 million. Financing activity included CECONY's June 2026 issue of $450 million of 5.15% debentures due 2036 and $850 million of 5.875% debentures due 2056; 7,000,000 common shares issued in March 2026 for approximately $776 million on settlement of a February forward sale; and, under a new $2.0 billion at-the-market equity program, forward sales covering 3,038,210 shares, of which 2,047,593 had been settled for approximately $216 million by September 30 (about $1.7 billion of capacity remained). Con Edison repaid a $500 million term loan, and in March 2026 Con Edison, CECONY and O&R replaced their revolving credit facilities with a single $3,500 million facility expiring in March 2031. Con Edison's common equity ratio rose to 49.5% at September 30, 2026 from 48.6% at year-end, and long-term debt (including the current portion) was $27,094 million. Customer receivables remain elevated: CECONY's aged balances were $1,345 million of $2,917 million. **Contingencies to watch.** - In May 2026 a woman died after falling into a manhole with a dislodged cover in Midtown Manhattan; a lawsuit seeks compensatory and punitive damages from CECONY, which expects insurance to cover liability above a non-material self-retention but cannot estimate the loss. - The state's investigation of non-conforming gas and steam main welds, in which contractors substituted duplicate weld films, continues; two contractor employees were indicted in August 2025. - In July 2026 the NYSPSC ordered the Utilities to show cause why it should not begin a prudence review and penalty proceeding over electric-vehicle make-ready program data reporting; the Utilities responded in October 2026. - In July 2026 the City of New York filed a crossclaim against CECONY in the Gowanus Canal Superfund litigation, alleging about $710 million of response costs to date and total project costs of about $1,700 million for combined-sewer-overflow tanks. - The NYSPSC's audit of the Utilities' historical income-tax accounting continues; related income-tax regulatory assets, which do not earn a return, were $1,000 million at CECONY at September 30, 2026. ## Subsequent events *Sources: Q3 2026 Form 10-Q, accession 0001047862-26-000155 (the 10-Q has no separate subsequent-events note; post-period items are disclosed in Notes A and C and in the MD&A); Q3 2026 earnings presentation, accession 0001047862-26-000157; Forms 8-K, accessions 0001193125-26-462726, 0001193125-26-467177 and 0001193125-26-472369.* The following occurred after September 30, 2026: - **Honeoye sale (October 2026).** CECONY and Con Edison Transmission completed the sale of their interests in Honeoye Storage Corporation, an upstate New York gas storage company, for $5 million in aggregate — approximately $1.5 million attributed to CECONY — before closing adjustments and expenses. After the MVP and Honeoye sales, the Q3 2026 10-Q describes Con Edison Transmission solely as a developer and owner of interests in electric transmission projects. - **Dividend (October 15, 2026).** Con Edison declared a quarterly dividend of 88.75 cents a share; the company describes 2026 as its 52nd consecutive year of dividend increases. - **O&R debentures (October 2026).** O&R issued $100 million of 6.62% debentures due 2056 and agreed to issue a further $75 million of the same debentures in December 2026. - **Regulatory orders (October 2026).** The NYISO determined that the Champlain Hudson Power Express line had demonstrated its planned capability, removing the near-term New York City reliability need, although it still foresees reliability concerns for New York City and the Lower Hudson Valley from 2032. The FERC reaffirmed that PJM's cost allocations for more than 600 regional transmission projects must be recalculated back to 2015 without a de minimis threshold, which could produce a refund to CECONY — to be credited to electric customers — in an amount it cannot yet estimate. The NYSPSC allowed O&R's Haverstraw West Loop thermal-energy-network pilot (cost capped at $50.1 million) to proceed but did not advance CECONY's pilots, allowing CECONY to defer its development costs for future recovery. - **CECONY $700 million debenture offering (November 12, 2026).** CECONY agreed to sell $700 million of 6.40% Debentures, Series 2026 C, due December 1, 2056, at a public offering price of 99.375% of principal (yield to maturity 6.447%), with settlement on November 16, 2026. The issuer is CECONY, not the holding company. - **Con Edison forward equity sale (November 16, 2026).** Con Edison, Inc. entered into a forward sale agreement with Bank of America, N.A. covering 6,000,000 common shares at an initial forward price of $119.81 per share, sold through BofA Securities. Con Edison expects to settle by December 31, 2027, and receives proceeds only when it settles. - **Controller succession (announced November 19, 2026).** Joseph Miller, Vice President and Controller (principal accounting officer) of Con Edison and CECONY, will retire from the role on February 28, 2027. Edlyn Misquita, Vice President and General Auditor of CECONY since June 2019, will succeed him effective March 1, 2027.